(1250) (4-65)
FRAME 4-66.
The heading of the tunnel reconnaissance report is brief, serving only to record the destination of the report,
the name, rank, and unit the reconnaissance officer, and the date.
In the tunnel reconnaissance report, the date, destination and originator of the report are found in the
______________________________________ .
(To carry loads over 10 tons, stream bottom must be repaired) (4-93)
FRAME 4-94.
The reverse side of DA Form 1251 contains space for _______________________ of a ___________________
and a ____________________________ ____________________________ . Space is also provided for additional
_______________________ .
4-20