(Section I; 1248) (4-8)
FRAME 4-9.
The general information recorded Section I includes the UTM grid coordinates of the limit of the
reconnaissance, the route designation, length in either kilometer a miles, and the upper and lower limits of the
traveled way width. What is the width o roadway shown on the sample report? _____________________________
(1249, bridge reconnaissance) (4-36)
FRAME 4-37.
It is not always necessary, even in a deliberate reconnaissance, to investigate every element related to bridges.
The nature of the mission dictates the elements to be reported. For example load class and overhead clearance are
not needed for demolition.
The amount and extent of bridge data reported depends upon the ____________________________________
of the _______________________________ for which the reconnaissance is performed.
4-19