(four) (4-6)
FRAME 4-7.
Sections I through IV are principally devoted to specific information about the road itself. The heading, which
appears at the top of the front of the form, gives the names of the reconnaissance party leader, the destination of the
report, map reference, and date/time of the information.
Information which identifies the road classification mission and the personnel who ordered and accomplished It
is contained in the __________________________________________________________ at the top of Form 1248.
(symbols; route reconnaissance overlay) (4-34)
FRAME 4-35.
Deliberate bridge reconnaissance procedures, which provide data in sufficient
detail for structural analysis, are
undertaken when the military load classification of a bridge must be calculated, or the bridge must be repaired or
demolished.
When bridge data is needed in sufficient detail for structural analysis, a _______________________________
bridge reconnaissance is performed.
4-15