(heading; 1248 general) (4-11)
FRAME 4-12.
Detailed information
about the alinement, surface, drainage and foundation of
the road is
recorded in
Section II.
Section II of DA Form 1248 records the _______________________________ information about the road.
(go to next frame) (4-39)
FRAME 4-40.
The bridge is identified in Column 1 by the serial number used on the route reconnaissance overlay. Bridge
location is reported in Column 2 by UTM grid coordinates.
The serial number, shown in Column __________________ serves to ______________________________ the
bridge. In Column 2 the bridge location is indicated by _______________________ ________________________
__________________________ .
4-25