8.
You are erecting a swing-stage scaffold on a building. How do you keep the scaffold from
swinging outward after it has been hoisted?
A.
By placing working weights on the outside edges of the scaffold
B.
By keeping your hands on the building while hoisting the scaffold
C.
By lashing the scaffold to the building
D.
By equipping the scaffold with stirrup rollers
9.
You are on a 15-foot ladder and you need help to complete a paint job. You tell your helper to
___________.
A.
Start painting from the lower side
B.
Get another ladder
C.
Get onto your ladder with you
D.
Erect a lean-to scaffold
10.
You are erecting a rolling tower that will have a base dimension of 4 square feet. What is the
maximum height, in feet, of the tower?
A.
12
B.
16
C.
20
D.
24
4-29
EN0562