5.
An engineer reconnaissance report is required for what type(s) of reconnaissance?
A.
General
B.
Hasty
C.
Deliberate
D.
Both hasty and deliberate
6.
If a work estimate is included as part of an engineer reconnaissance report, what is
entered in the work-estimate column?
A.
Yes
B.
No
C.
Equipment needed
D.
Man-hours required
7.
Who must sign the authentication block at the bottom of an engineer reconnaissance
report?
A.
The person who performed the reconnaissance
B.
The reconnaissance team leader
C.
The company commander
D.
The platoon leader