6.
You have received detailed drawings and a blueprint for constructing desk drawers. When you start cutting the wood,
how would you mark the pieces?
A.
"sides", "fronts", "backs"
B.
"sides" (identified "left", "right"), fronts, backs
C.
1, 2, 3, 4, 5
D.
sides, fronts, tops
7.
You have received parts for a wooden article. They are supposed to have been milled to size, shaped, and sanded.
You must now make a preassembly check of each part. What do you check first?
A.
dimensions
B.
shape
C.
fit
D.
weight
8.
What wood do you recommend for making fine furniture?
A.
cedar
B.
redwood
C.
mahogany
D.
plywood
9.
What is the spacing of the rafters in a framed prefab building?
A.
4-foot
B.
4-foot on center
C.
3-foot on center
D.
3-foot on edge
10.
How far apart in feet do you space the floor girders that run the length of a quonset hut?
A.
4'10" on center
B.
5' on center
C.
5'1" on edge
D.
5'1" on center
11.
Why would you place screws through each of the four holds in the bottom of the stud in a quonset hut?
A.
to serve as a fastening point for siding
B.
to remove a stud
C.
to splice two lengths of channel plate
D.
to fasten arch ribs to the channel plate
2