3-7. Summary.
This lesson addressed-
C2 measures used to control mission progress at the battalion
and TF levels.
The requirement to adjust task organization a necessary once
the mission is underway.
Personnel and functions of the TAC, the TOC, and the unit
trains CP.
Procedures used by the engineer officer to monitor and control
engineer unit actions.
Methods for recommending necessary adjustments to the task
organization of engineer elements during the mission.
3-15
EN5483