Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Engineer Reference and Training Manuals
>
> Figure 1-28. Blind nailing
Figure 1-26. Floor plan
Figure 1-30. Floor plan
Carpentry II
Page Navigation
15
16
17
18
19
20
21
22
23
24
25
Figure
1-27.
Staggered
board
joints
Figure
1-28.
Blind
nailing
i.
Stand
on
the
board
to be
nailed
when
nailing
the
floor
in
place.
This
holds
the
strips of
flooring
in
place
(see
Figure 1-29).
Figure
1-29.
Nailing
floor
in
place
EN5156
1-20