30.
Determine how many studs are required for one side of the form.
A.
120
B.
121
C.
124
D.
126
31.
Determine how many double wales will be required for one side.
A.
2
B.
3
C.
4
D.
5
32.
Determine the time required to place the concrete (in hours).
A.
0.5
B.
1.0
C.
1.5
D.
2.0
33