13.
Determine the adjusted tie-wire and/or stud location (spacing).
A.
18
B.
20
C.
25
D.
Does not apply for snap ties
14.
Determine how many studs are required for one side of the form.
A.
121
B.
122
C.
126
D.
131
15.
Determine how many double wales will be required for one side.
A.
2
B.
3
C.
4
D.
5
16.
Determine the time required to place the concrete (in hours).
A.
0.5
B.
1.0
C.
1.5
D.
2.0
29