(attention to detail) (2-63)
FRAME 2-64.
The schedule for any reconnaissance party is based upon the time available to perform the mission and the
amount and kind of data desired. Adherence to the schedule is essential, to avoid either omitting important
information or missing the deadline.
Moving too fast, and missing important data or moving too slowly, and missing the deadline, can be avoided by
careful ____________________ ____ _______ _____________________.
(2 hours) (2-87)
FRAME 2-88.
The amount and type of engineer effort, in man-hours, equipment, and materials, required for construction,
repair, or removal, as needed, of reported items is indicated in the _______________________________ on the
reverse side of DA Form ___________________.