Lesson 2/Learning Event 2
Problem #1: T/O Airfield Design
Design a support area, fully operational, tactical airfield capable of handling F-4C traffic. Design the
Type C traffic area only. The following materials are available:
Surface:
Asphalt concrete pavement
Surface treatment
Base:
Sand shell
Subbase: Borrow material, GP, maximum size = 1-1/2", CBR = 0,
40% passes the #10 sieve, 4% passes the #200 sieve, LL = 20,
PI = 4.
Select:
None
Subgrade: ML, PI = 5, CBR = 4.
Solution:
Step 1 - Check the materials.
(1) The base material has a CBR of 80 (Table 7-2).
(2) The borrow material meets the criteria for a CBR 50 (Table 12)
Step 2 - Determine the aircraft characteristics (Table 13-10).
For an F-4C:
Design gear load
-
26.0 kips
Design curve
-
D-27
Pavement
-
3-1/2"
Base
-
6" minimum
Step 3 - Determine the cover requirements (Fig. D-27).
Step 4 - Determine the thickness design.
49