Lesson 1/Learning Event 4
Step 4 - Determine Surface and Base Thickness (Table 9)
For 100 CBR Base, Pavement = Multiple Surface Treatment (1')
Base = 4" (minimum)
Step 5 - Determine Thickness Design
Step 6 - Add Compaction, Draw Final Design Profile
34