29.
Determine the adjusted tie-wire and/or stud location (spacing) (in inches).
A.
6
B.
8
C.
9 (step 14)
D.
10
30.
Determine how many studs are required for one side of the form.
A.
120
B.
121
C.
124 (step 15)
D.
126
31.
Determine how many double wales will be required for one side.
A.
2
B.
3
C.
4 (step 16)
D.
5
32.
Determine the time required to place the concrete (in hours).
A.
0.5
B.
1.0
C.
1.5
D.
2.0 (step 17)
40