(work estimate) (4-17)
FRAME 4-18.
To repair or bypass a road crater of this size, it is logical to assume the need for engineer effort, and therefore, a
work estimate. The reverse side of Form 1711-R provides for work estimates when necessary. What other
_________________________________
_________________________________
_________________________________
(spans) (4-45)
FRAME 4-46.
When there is more than one span to be described, they are listed in sequence starting from the west. If the
bridge runs due north and south, the spans are listed from the north and the letter N precedes the number of spans.
If the bridge has more than one span, they are listed in sequence starting from the ______________________ .