(orders; mission) (2-60)
FRAME 2-61.
The party leader selects the general route to be followed, prepares a time schedule, and chooses the equipment
and personnel necessary to perform the mission.
The actual reconnaissance mission is organized and scheduled by the____________________________.
(work estimates) (2-84)
FRAME 2-85.
Each work estimate is keyed by its critical point number to the appropriate item with the same number on the
front of the form. Which item was reported on the front of the sample Engineer Reconnaissance Report as needing a
work estimate? ________________________________________________________________________________
_____________________________________________________________________________________________