easily. If the bypass consisted of a ford, what important information about the stream must the reconnaissance party
obtain in order to fill out block 11 of the Ford Reconnaissance Report?
13. If a Ford Reconnaissance Report is added as a result of reporting on the bypass of Bridge No. 2, what
change must be made to DA Form 1248? ____________________________________________________________
14. Item 15 of
the Tunnel Reconnaissance Report, DA
Form 1250, is
used to
report the vertical
and horizontal
clearances in the tunnel. When measuring tunnel width for horizontal clearance, where is the measurement made?
a. at traveled way level
b. 30 inches or higher above traveled way
c. 4 feet or higher above traveled way
d. at widest height above traveled way
15. If you were preparing a classification formula for the route which included the ferry reported in Panel 4-9,
what military load classification would you include in the formula?
4-75